Home Standby Generator Installation: The Complete Process
Know what should happen between the site visit and the outage test—and what a complete installation proposal should include.
Read article
Tell Brite about your property and the backup-power solution you are considering.
Prefer to speak with someone? Call Brite Generators directly for help with your next step.
You do not need to know the model or generator size before getting started. Use the calculator, then Brite Generators can help you plan the next step.
Explore Generac generator options available through Brite Generators.
Use Brite Generators primary planning tool to narrow down the generator that fits your needs.
Start with the generator calculator. It gives us the information needed to guide you toward the right backup-power option.
Explore additional energy solutions available through Brite Generators.
From planning and installation to maintenance and repair, BriteGen helps customers through the full generator lifecycle.
Send Brite Generators the information needed to discuss pricing and next steps.
See referral rebate details, requirements, and available next steps.
Use Brite Generators FAQs, planning tools, and customer information to understand your options before choosing a generator.
Generator installation and service coverage throughout Warren County.
Brite Generators Articles
Plan placement, clearances, pads, permits, fuel and electrical work, automatic transfer equipment, commissioning, and the full installation sequence.

Know what should happen between the site visit and the outage test—and what a complete installation proposal should include.
Read article →
Follow the outage sequence from utility failure to generator power, and understand the pause, load delays, and return to normal service.
Read article →
Understand the difference between wall clearance, distance from openings, overhead space, and the room technicians need to service the generator.
Read article →
Separate the transfer switch’s current rating from generator output, then compare whole-service and selected-load arrangements.
Read article →
Decide which circuits receive backup and what can operate together; “whole-house transfer” alone does not promise unlimited generator power.
Read article →
Separate the days a crew is on site from the weeks needed for design, equipment, utilities, permits, inspections, and final testing.
Read article →
Check full-load fuel demand, pressure under load, meter or tank capability, and the entire pipe route before approving a fuel connection.
Read article →
Find out whether the transfer switch will serve as the service disconnect or sit downstream of one, and why that changes the equipment.
Read article →
Identify the authority for your address, assign permit and inspection responsibility, and prepare the site before the crew arrives.
Read article →
Compare what you must do during an outage, who needs to be home, and what an automatic system actually automates.
Read article →Explore Generator Topics